Programming in particular has negative effects after the point of being tired. You make mistakes, you commit bad code, you have to maintain bad code for the lifetime of hte product.
That one grind where you kept pushing could keep affecting the productivity of the whole engineering team for the next 2 or 3 years. I've seen it happen. A lot.
I would assume doing strategizing or negotiating when tired could equally have devastating long-term effects on the business side.
Work as long as you want, just don't work tired. It isn't worth it.
That one grind where you kept pushing could keep affecting the productivity of the whole engineering team for the next 2 or 3 years. I've seen it happen. A lot.
I would assume doing strategizing or negotiating when tired could equally have devastating long-term effects on the business side.
Work as long as you want, just don't work tired. It isn't worth it.