Ok, this is a safer design. Anyway, my point is that loosing the cooling system of an active nuclear plant is much worse than loosing the cooling system of the shutdown nuclear plant (but don't try that at home). So it's not necessary to rush to dismantle the nuclear material, because of the fear of a tsunami. Those material should be handled properly.